Presentations by CMA Engineering, Inc.
Matches: 2
Integration of Membrane Processes into the Existing Potable Water Treatment Infrastructure at WCID 18 Austin, TX
Presented: 08/04/04
The paper described the evaluations done prior to the decision to integratae a membrane process into the exisiting potable water infratructure at WCID 18 in Austin TX...
MBRs Come to Hays County
Presented: 07/13/09
This paper talks about the permitting challenges and utiliziation of MBR in order to meet surface water discharge permit requirements for Hays County, Austin, Texas. The discharge goes to an iconic landmark which provides year round recreational swimming in the heart of Austin and is home to the Barton Springs Salamander. This is the first surf...