Presentations by Hatch Mott MacDonald
Matches: 3
High Tech and History - Operational Experience with the City of New Brunswick's 15 MGD MF Plant
The new Brunswick, NJ WTP consisted of 2 treatment trains. Train 1 utilized gravity filters and Train 2 included pressure filters. The pressure filters were no longer meeting filter turbidity effluent requirements. Membranes were selected as an appropriate technology because they could be installed without disrupting Train 1 operations. 3- units we...
Built To Last: A Review of 10 Years of Performance of New Jersey's First Microfiltration Plant
This paper provides an historical overview of the design of the Southeast Morris Municipal Utility Authority?s water treatment plant, focusing on the operating history and modifications that have been made to the plant....
Piloting MF into NF for Hardness Removal
This paper describes the pilot program for treating a surface water for hardness reduction and the findings. Direct membrane filtration was selected for the filtration unit process. Nanofiltration with bypass blending was selected for the hardness removal unit process. The proposed new plant will have a maximum permeate production capacity of 420...