Optimizing Replacement Membranes at the 10 mgd City of Pompano Beach Nanofiltration Plant
Pompano Beach is conducting pilot testing to optimize chemical pretreatment and power costs for replacement nanofiltration membranes. Preliminary pilot testing appears to indicate that operation without acid or antiscalant pretreatment, at a lower feed pressure than previous membranes, may be feasible....
Optimized Chemical Pretreatment and Membrane Element Performance at a 10 MGD Nanofiltration Plant
The City of Pompano Beach has a 50 million gallon per day (mgd) water treatment plant that includes a 10 mgd nanofiltration (NF) process. The NF process includes five 2-mgd NF units. The units are two-stage, in a 36:16 array. The NF units were previously populated with hybrid of membrane elements that were installed in 2009. These membranes were se...
Optimized Chemical Pretreatment and Membrane Element Performance at a 10 MGD Nanofiltration Plant
The City of Pompano Beach has a 50 million gallon per day (mgd) water treatment plant that includes a 10 mgd nanofiltration (NF) process. The NF process includes five 2-mgd NF units. The units are two-stage, in a 36:16 array. The NF units were previously populated with hybrid of membrane elements that were installed in 2009. These membranes were se...