Presentation by Adam Evans, PE
Matches: 1
Water Supply Augmentation: Pilot Testing Multiple Membrane and Filtration Technologies for Phosphorus Removal
Presented: 07/23/2007
A recent long-range water-planning study concluded that Dallas Water Utilities will need to reuse 120 mgd of treated wastewater effluent in the near future. It is envisioned that 60 mgd of this requirement will come from the Southside Wastewater Treatment Plant (Southside). The Phase IV Expansion provides a timely opportunity to produce effluent su...