Presentation by Brad Sours, PE
Matches: 1
EMWD?s Perris II Desalter Design Refinements: Source Water Quality/Equalization, Pre-Treatment, Phasing/Integration, and Beyond!
Presented: 02/25/19
This paper summarizes specific challenges, considerations and solutions associated with the design of Eastern Municipal Water District?s (EMWD?s) Perris II Desalter. Topics include source water quality/equalization, pre-treatment, integration with existing facilities, phasing considerations, and RO concentrate volume minimization. The paper will pr...