Presentation by Dylan Uecker
Matches: 1
A Business Case for 2-stage RO System Design
Presented: 02/25/19
The abstract describes how three RO trains were designed with varying arrays to treat a single water source. Each of the different arrays were then used to estimate the construction and operation costs. The paper then compares the costs to one another, arguing that 2-stage arrays are cheaper to construct and operate than 3-stage designs with the gi...