Presentations by Jared Hartwig
Matches: 2
Hitting a Moving Target - Designing an MBR System with Uncertain Nutrient Limmits
The Fort Mill Water Pollution Control Plant (WPCP) is currently permitted to treat a capacity of 3.0 mgd, with current flows closer to 1.3 mgd. Due to the proximity of the service area to the City of Charlotte and ongoing local development, annual average flows are projected to almost triple by the year 2024. As a result, the Town of Fort Mill init...
Hitting a Moving Target - Designing an MBR System with Uncertain Nutrient Limmits
The Fort Mill Water Pollution Control Plant (WPCP) is currently permitted to treat a capacity of 3.0 mgd, with current flows closer to 1.3 mgd. Due to the proximity of the service area to the City of Charlotte and ongoing local development, annual average flows are projected to almost triple by the year 2024. As a result, the Town of Fort Mill init...