This paper shares ten years of lessons learned and the value of integrating system design and project delivery approaches for the OBM2 treatment expansion to maximize the value delivered to the client. It details the contracting approaches used to maximize cash flow and assign risk commensurate to capabilities, procurement practices to maximize quality and avoid delays, collaborative approaches between the Region, the contractor and the engineer to leverage the strengths of each party, and design integration through 3D design and value engineering.
This presentation is available to AMTA Members only.
Speaker
- Jesus Garcia-Aleman, PhD, PE
Company
- CH2M HILL Canada Ltd.
Event
- AMTA/AWWA Membrane Technology Conference, Orlando, FL
Session
- AMTA/AWWA Membrane Technology Conference
Date
- 03/02/15
Media
Keywords
- Value Engineering, 3-D Design, Risk, Region of Peel, Toronto Canada
Reference
- 9674-DP1623