This presentation provides an overview of the commissioning and performance proving of a highly complex 6 MGD water treatment plant designed, built, and commissioned by CDM Smith. Located in the USA?s Mojave Desert, the treatment processes include three different membrane treatment systems (EDR, UF, and RO) in addition to lime softening, ion exchange, and mechanical evaporation to achieve a ZLD goal of greater than 99% water recovery.
This presentation is available to AMTA Members only.
Speaker
- Colin M. Hobbs, PhD, PE, BCEE / Christian Sanders, C.PE
Company
- CDM Smith Inc.
Event
- AMTA/AWWA Membrane Technology Conference, West Palm Beach, FL
Session
- Membrane Technology Conference (MTC18)
Date
- 03/13/18
Media
Keywords
- Commissioning, ZLD, Membranes
Reference
- 9685-DP2113