This paper focuses on the assessment of RO and NF performance, and specifically addresses the full-scale desalination design to accommodate water quality fluctuations as well as evaluating the performance of the desalination membranes during feedwater conditions that varied from their ideal design conditions The pilot plant was located at CCWD’s Mallard Slough Pump Station site near Pittsburg,California adjacent to the Estuary at Suisun Bay
This presentation is available to AMTA Members only.
Speaker
- Stefani Harrison
Company
- MWH Global, Inc.
Event
- AMTA Annual Meeting, San Diego, CA
Session
- San Diego Biennial
Date
- 07/12/10
Media
Keywords
- pilot testing, reverse osmosis, nanofiltration, Mallard Slough Pump Station
Reference
- 9650-DP538