New 3.5 MGD reverse osmosis plant introduction and overview. Experiences of starting up a new reverse osmosis plant including the trains themselves, chemical feed systems, pumps for distribution, and overall building systems. Grimes need for more water production was the reason for the new, larger reverse osmosis plant. Remodeled 1.4 MGD lime softening plant for blending with the reverse osmosis water
This presentation is available to AMTA Members only.
Speaker
- Nick Deardorff
Company
- USW Utility Group
Event
- AMTA Technology Transfer Workshop, Des Moines
Session
- AMTA Technology Transfer Workshop
Date
- 05/10/22
Media
Keywords
- Reverse Osmosis, Construction Experiences, Water Demand Struggles
Reference
- 9713-DP2924