The Cave Creek Water Reclamation Plant (CCWRP) is one of three wastewater treatment facilities either owned or co-owned by the City of Phoenix (City). The 8 mgd facility was placed in operation in 2002 but was taken offline in 2009 due to slower than anticipated growth in the surrounding area. Due to resumed growth, the City authorized Black & Veatch (B&V) to conduct a Phase I Feasibility Study (completed in 2017) to identify any existing design limitations and evaluate alternatives to improve overall process performance and reduce operational costs. Phase II CCWRP improvements include the design/equipment procurement of membrane systems (MBR and RO) to expand the plants reuse production capacity and improve reclaimed water quality.
This presentation is available to AMTA Members only.
Speaker
- James DeCarolis
Company
- Black & Veatch
Event
- AMTA/AWWA Membrane Technology Conference, Las Vegas
Session
- AMTA/AWWA Membrane Technology Conference
Date
- 02/22/22
Media
Keywords
- Cave Creek Water Reclamation Plant, MBR, RO
Reference
- 9715-DP2803