This paper provides a summary of the membrane evaluation, condition assessment, evaluation results, design considerations for the system upgrade and a discussion of several items found during commissioning.
This presentation is available to AMTA Members only.
Speaker
- Mickal Witwer, PE / Steve Messner / Joseph Elarde, PE / Tom Sivert / Howard Brogdon / Nick Easter, PE
Company
- JACOBS / Collier County Public Utilities / JACOBS / Collier County Public Utilities / Collier County Public Utilities / JACOBS
Event
- AMTA/AWWA Membrane Technology Conference, West Palm Beach, FL
Session
- Membrane Technology Conference (MTC18)
Date
- 03/13/2018
Media
Keywords
- Replacement, Upgrades, NF
Reference
- 9685-DP2119