As the City of Kennewick, Washington looks to increase the capacity of the membrane water treatment plant (WTP) to its full master planned capacity of 30 MGD, they have identified the need to conduct membrane optimization study with a goal of energy/operation cost savings. This presentation shares historical operational performance of the membrane units over the last three years, optimization options identified for consideration and the results from the optimization testing conducted during the optimization period.
This presentation is available to AMTA Members only.
Speaker
- Nathan Kutil
Company
- HDR Engineering, Inc.
Event
- AMTA/AWWA Membrane Master Class Webinar II - Part 3, Online
Session
- AMTA/AWWA Membrane Master Class Webinar Series II
Date
- 04/28/21
Media
Keywords
- Performance, Optimization, Savings
Reference
- 9610-DP2538