The Value and Challenges of Chlorination/Dechlorination Process Optimization in Power Generation

Quality of the steam cycle water requires special attention and chlorination/dechlorination phase is very important, especially for reclaimed water sources. Efficient control of residual chlorine allows for minimizing RO membranes maintenance and extending their life. Optimized dechlorination, permitted by accurate ultra-low range chlorine monitoring, resulted in over 30% reduction in sodium bisulfite usage and halved […]

Longer Term Impact of Desalinated Water on Blended Supplies

The Claude “Bud” Lewis Carlsbad Desalination Plant (CDP) was completed in December 2015 and produces approximately 50 MGD of locally controlled drought-proof, potable water for San Diego County. The Water Research Foundation (WRF) initiated Project 4773, entitled Carlsbad Desalinated Seawater Integration Study, to assess the integration of seawater desalinated with reverse osmosis (SWRO) into the […]

A Plethora of Seawater Intakes Which Will Be Selected?

The Claude “Bud” Lewis Carlsbad Desalination Plant (CDP), pictured in Figure 1, has been operating for nearly 3 years, producing approximately 50= million gallons per day (MGD) to meet 10 percent of the City of San Diego’s daily potable water demands. The plant has been operating under a temporary State Water Quality Control Board (Water […]

A Plethora of Seawater Intakes Which Will Be Selected?

The Claude “Bud” Lewis Carlsbad Desalination Plant (CDP), pictured in Figure 1, has been operating for nearly 3 years, producing approximately 50= million gallons per day (MGD) to meet 10 percent of the City of San Diego’s daily potable water demands. The plant has been operating under a temporary State Water Quality Control Board (Water […]

Using MBR for On Site Water Recovery in New Mexico – Challenges and Solutions

The Albuquerque Bernalillo County Water Utility Authority (Water Authority) is developing a state of the art on site water resources recovery plant, located at a shopping center in the uptown district of Albuquerque. The Winrock Town Center was originally constructed in the early 1960s and is currently undergoing a complete renovation. The vision for the […]

Using MBR for On Site Water Recovery in New Mexico – Challenges and Solutions

The Albuquerque Bernalillo County Water Utility Authority (Water Authority) is developing a state of the art on site water resources recovery plant, located at a shopping center in the uptown district of Albuquerque. The Winrock Town Center was originally constructed in the early 1960s and is currently undergoing a complete renovation. The vision for the […]