USING A SINGLE SET OF MEMBRANE EQUIPMENT FOR BOTH DIRECT FILTRATION AND SETTLED WATER FILTRATION. The City of Mansfield (City) Bud Ervin Water Treatment Plant (WTP) has underdone multiple expansions over the past three decades. The Phase IV expansion was the most recent expansion and included the selection and design of a low-pressure membrane system. Phase I, II, and III utilized conventional treatment systems (flocculation/sedimentation followed by gravity filtration). The membrane system was selected due to site limitations and the City?s desire to continue to phase the needed capacity in over time.
This presentation is available to AMTA Members only.
Speaker
- LeAnna Risso
Company
- Clark County Water Reclamation District
Event
- AWWA/AMTA Membrane Technology Conference, Glendale, AZ
Session
- AWWA/AMTA Membrane Technology Conference
Date
- 02/27/12
Media
Keywords
- MIT Pressures, Tertiary Filtration, Applications
Reference
- 9658-DP1045