This presentation reviewing the transition to as microfiltration plant at the Water Replenishment District in California was given at a Preconference Workshop in 2014 that discussed membrane plants from an operators point of view. Influences on the Alamitos Barrier along with operating challenges were given. The results of the change to MF and mitigation studies were reviewed.